Description
Fiberglass Pipe Repair Wap Industrial Pipeline Fix Tape Gas Water Pipe Repair Bandage Pipe repair bandage is an extremely convenient and effective product for the emergency repair of less severe pipe leaks on steel,HDPE, rubber hoses, ventilation ducts, plastic both underground and surface application. Quick and simple to use with no mixing or measuring required. A successful pipe repair can be achieved in only 30 minutes! Resin Makeup Water-activated Polyurethane Heat Resistance 150°C (300°F) Pressure Resistance Internal Pressure up to 15Mpa (5075psi) Bonds to Most Pipes Steel Polypipe PVC Fibreglass Copper Set Time 20 – 30 minutes, sets under water Chemical, Fuel and Oil Resistant Acid lines Oils Gas Sea water MDISC 2" /3" / 4" /5"/ 6"x 132", Pipe Repair Wrap, Repairs Up To 1-1/4 To 3" Diameter Pipe, Water Activated Fiberglass Wrap,Sets Like Steel, Repairs Almost Any Material, No Tools Needed, 600 PSI Strong, Cures In 30 Minutes. For Pipe Repair Bandage,normal size as below: ( The length can be produced as your need) Name Model Size Packing Pipe Repair Bandage UT002 50mm x 3.6m (2" x 12´) 10rolls x 10rolls/ctn UT003 75mm x 3.6m (3" x 12´) 10rolls x 10rolls/ctn UT004 100mm x 3.6m (4" x 12´) 10rolls x 10rolls/ctn UT005 125mm x 3.6m (5" x 12´) 8rolls x 10rolls/ctn UT006 150mm x 3.6m (6" x 12´) 8rolls x 10rolls/ctn * Clean and roughen the damaged area with the metal file or wire brush, which will help resulting a more successful repair. *Knead Steel Putty and apply firmly into damaged area. Putty has a 2-5 minute work time, and the bandage application must begin during this time. * Put gloves on,Soak bandage in fresh water for 10 seconds. Squeeze bandage 1-2 times while in water to help activation. * Squeeze out the access water, apply the bandage spirally around the damaged pipe area. Extending up to 50mm (2″)either side of the leaked area. * With wet gloves, squeeze the bandage with a rotating motion until resin stops foaming and is set. Bond in 30 minutes Pipe Repair Bandage Tips: To achieve the best result,the bandage should be more than 10mm thick (10-15 layers). Allow 30 minutes for bandage to set rock-hard. Test Report:The Repair Bandage can with withstand the inner pressure over 15Mpa after activated with water. ( The repair tapes must be used together wih epoxy putty. Delivery: 5-7 working days Our Advantages: ◆ Factory production and price. ◆ 7-15 days’ lead time. ◆ Free samples for you to test the quality. ◆ 13 years professional manufacturing experience for Fiberglass Pipe Repair Bandage. ◆ OEM your size and packing. Why use Unique-technology Pipe Repair Bandage? ◆ Allows time for more effective shut down ways. ◆ Less shuting downs save time and money. ◆ Reducing overheads. ◆ Extends life of the pipe. Our Bandage as a quick repair solutions has many benifits: ◆ 30 minutes repair time. ◆ Easy to use. ◆ Flexible -can go on different pipe sizes,shapes (elbows ec) and substrates. ◆ Cost efficient. ◆ OHS benefits-leaks are stopped faster. ◆ 2 years shelf time. Our Pipe Repair Bandage can be used to Repair Oil , Gas & Water Pipeline etc,and adheres to pipes with Metal, plaster, PVC, Copper, Rubber, Fiberglass, Concrete, Wood, Ceramic, Polyester etc materials.
- Fiberglass Pipe Repair Wap
- Industrial Pipeline Fix Tape
- Gas Water Pipe Repair Bandage
Production Capacity:
200000
Delivery Timeframe:
Immediate
Incoterms:
CFR - Cost and Freight
CIF - Cost, Insurance and Freight
FOB - Free on Board
Packaging Details:
10 bags / box , 10 boxes / carton
More about
Shaanxi Unique-technology Co.,Ltd
50-100
Employees
1
Sales volume (USD)
50%
% Export sales
Year
Established
Business type
- Industry / Manufacturer
Keywords
- Pipe Repair Wrap
Contact and location
- Mandy Li
- +86 xxxxxxxx
- Xi'an / Shaanxi | China