Main Banner Desktop
shanghairoadphalt

Shanghai Roadphalt Asphalt Technology Co.,Ltd

Unverified company Unverified company
  • Imagem 1

Roadphalt colored cold mix asphalt concrete surface layer of the system


Unit Price:

USD 850,00

FOB Price:

Not informed

Minimum Order Quantity:

1 Ton

Type of Payment:

L/C (Letter of Credit)

D/A (Documents Against Acceptance)

D/P (Documents Against Payment)

T/T (Wire Transfer)

Preferred Port:

Shanghai

Reference:

Not informed


Description

Product profile<br />
Roadphalt colored cold mix asphalt concrete surface layer of the system is a efficient construction plan. Which makes the roadphalt colored cold modified asphalt mixture fast molding by using paving equipment. The system uses unique OGFC-5 open-graded skeleton void structure, the voidage of pavement can reach more than 12%. The thickness of the molding is 0.7-1.5cm .<br />
It is used to build road colored asphalt surface or pave Colored asphalt layer on the original pavement.As a new green pavement material, the advantages of system are  economic, environmental, beautiful and convenient . <br />
Scope                                   <br />
Landscape garden             <br />
      Square <br />
      Non-motorized vehicle,Sidewalk<br />
      Bridge floor , Elevated pavement<br />
      Other pavements <br />
 <br />
Product Features<br />
I.Economy 


Reducing the cost of asphalt material greatly

Generally, the thickness of conventional colored hot mix asphalt concrete surface layer not less than 3cm .However , the construction thickness of roadphalt colored cold mix asphalt concrete surface layer of the system just need 0.7-1.5cm. Material consumption is reduced by 50%<br />
 <br />
2. Reduce production and construction cost<br />
Before mixing , need to ensure aggregate dry and clean .<br />
 <br />
3. colourful<br />
Cold mix technology without going through the high-temperature test, the pigment the molecular composition of has not changed, so it can maintain colorful and durable.<br />
 <br />
4.Environment-friendly <br />
Production at room temperature, so there is no asphalt smoke and dust emission.<br />
The whole construction process, without any pollution.<br />
<br />
 <br />
5.Convenient construction at room temperature  <br />
 <br />
In the above 10 degree can be construction. Not existing the loss of cooling the mixture to cool or cold threshing and other issues during construction .<br />
 <br />
Excellent performance & stable quality  <br />
 

Excellent cohesive property 

The system can ensure the cohesive materials have excellent cohesive properties because of  using special open-graded void skeleton structure. In addition, it cannot appear bleeding phenomenon under the vehicle load and high temperature condition<br />
 

Good water permeability  

The system uses unique open-graded void skeleton structure , so that can have higher permeability coefficient. Due to the existence of gaps , the rainwater can be ruled out quickly .<br />
 

Good slip resistance


The bigger voidage ,the better pavement friction .Due to the system has better slip resistance ,so that can ensure the safety of the driving .<br />
 <br />
4. Low noise and can improve the comfort of driving <br />
Roadphalt colored cold mix asphalt concrete surface layer of the system use unique OGFC-5 open-graded skeleton void structure, it can reduce the atmospheric pressure. The conventional dense graded pavement’s noise can be reduced 3-4 DB  and the cement pavements noise can be reduced 4-6 DB.<br />
 <br />
Construction guide <br />
Construction process :<br />
 <br />
Original pavement  →  pre-treatment → feeding → paving → roller compaction →   Molding  → open the traffic<br />
 <br />
Steps:<br />
Pavement pre-treatment<br />
 <br />
The original pavement should be dried and cleaned. Besides, the flatness and camber of the road should meet the requirement of construction.<br />
 <br />
Feeding<br />
It’s better to transport by using dump trucks, especially construction in large-scale. The site should have appropriate lifting equipment.<br />
Paving<br />
We recommend using paver and paving thickness is 0.7-1.5cm. If construction in a small area ,you can use artificial paving. In order to avoid segregation, you should control the thickness and flatness of the pavement.<br />
Roller compaction<br />
We should finish roller compaction within 0.5-1 hours after paving .using double drum roller to static pressure 3-4 times<br />
Open the traffic<br />
 The road can be opened after paving is completed 24 hours later . If you need to open the traffic faster , just make sure the asphalt(the surface of the road ) is dry completely .<br />
 <br />
 <br />
Packaging Detail :<br />
25 kg / bag<br />
 

  • colored cold asphalt pavement

Production Capacity:

200tons/day

Delivery Timeframe:

Within 30 Days

Incoterms:

CFR - Cost and Freight

CIF - Cost, Insurance and Freight

CIP - Carriage and Insurance Paid to

CPT - Carriage Paid to

EXW - Ex Works

FOB - Free on Board

Packaging Details:

25kgs/bay by wooden pallet


More about
Shanghai Roadphalt Asphalt Technology Co.,Ltd

icone de usuario

Not informed

sales icon

Not informed

icone de exportar

Not informed

Not informed

Year

Established


Business type

Keywords
  • Roadphalt
  • colored pavement material
  • road maintenance material
  • special asphalt and asphalt processing equipment

Contact and location
  • icone de usuario Gina Zou
  • icone de telefone +86 86 xxxxxxxx
  • map-marker Shanghai / China | China

Make your Request!

Make your Request!

Start conversation
logo-Whatsapp icon-checked-none

Hello 👋!
Can we help you?

Fill in your name and phone number 😁

Start conversation Start conversation